We are done and moving on to our next house!
| Exterior |
| Exterior 2 |
Foyer
|
| Kitchen/Dining |
![]() |
| Kitchen |
| Master Bedroom |
| Upstairs Bedroom |
| Stairs |
| Downstairs Living Room |
| Downstairs Living Room 2 |
| Downstairs Bedroom 1 |
| Downstairs Bathroom |
| Utility |
| Patio |
| Back Decks |
| Almost done hall bath. . . New door, vanity, and toilet. Just a few little things needed to do (trim, mirror, towel bars, etc.) |
| Bedroom 3. Carpet installed, closet added, leak in corner fixed. Just needs to be painted, a couple electrical things and furniture. |
| Bedroom 4. Carpet installed, bought furniture. Just needs new door and the last bit of ceiling tiles installed. |
| Another view. |
| Downstairs Living Room. Carpet installed, walls and ceiling painted. Just needs furniture and finish the built-ins in the corner. |
| Another view. |
| Kitchen. Granite and microwave installed. Painted first coat on walls. Just needs ceiling paint, backsplash, hardware on cabinets, filler panels on cabinets, and finish pantry. |
| Another view. New sliding door installed. |
| Another View. |
| Hall. Painted, new doors, some trim installed. Just needs door hardware and finish trim. |
| Foyer. Painted, trim installed, closet painted. Just needs outlet covers and door hardware. |
| Living room. Walls painted. Just needs trim and ceiling paint. |
| Hall Closet. Painted and ready for shelves. |
| Master Bathroom vanity. Our steal at auction. |
| Master Bedroom. Walls and ceiling painted. Trim installed and painted. Furniture came in. Just needs to assemble and set up room and paint window frames. |
| Master Closet. Painted and framed for built-ins. |
| Master Bathroom. Tiled shower and bench seat. Just needs paint and installation of toilet and vanity. |
| After we moved in |
| Painted walls and trim |
| Painted Ceiling Tiles |
| Finished putting cabinet doors and painted other walls and framed out utility closet |
| Bigger master closet |
| Pathetic looking master (half) bath shortly after moving in |
| New and improved master bathroom! |
| New master shower |
| Tile for the master bathroom |
| Our awesome room! :) |
| New entrance to bedroom 2 |
| Tough angle but. . From hallway looking into bathroom looking at linen closet |
| Tub completely installed and walls sanded. . . Ready for hardy board on floor and tile! |
| Floor tile for hall bathroom |
| Painting the final ceiling tiles. . . |
| Drywalled, spackled, and sanded. Just one more sanding and then paint! |
| New Hall |
| New Linen Closet in Hallway |
| Removed wallpaper in living room |
| Remember before. . .? |
| And now!!! |
| Just need the door pulls and the granite! |
| Can't wait to actually cook in here (or for Ryan to cook and me eat the wonderful food)! |
| Dining area |