Thursday, October 7, 2010

Week 3, 4 and 5 Progress AKA Blog FAIL

Well we have not been doing a good job keeping up with the blog. . . FAIL!  But the good news is that we've gotten a lot done!  Week 3 was little visual progress because it was all plumbing.  Week 4 was electric and framing and Week 5 has been mostly painting.  We've painted 2 rooms and the ceiling tiles to those rooms.  It's looking good but needless to say we are still living in a construction zone.

Utility Room After Painting

Utility Room During Installation of Relocated Kitchen Cabinets

At Top of Stairs After Demo

On Stairs During Framing

New Hallway/Foyer Area

Looking Down New Hallways- Bedroom 2 @ End of Hall, Master Bath on Left @ end, Hall Bath Toward the Front of Hallway on the Left

New Tub in Hall Bathroom!!

Removed Fake Beams in Living Room, Installed Recessed Lights in Ceiling

Removal of Beam Where an Old Wall use to Be
Downstairs Living Room/ Painting Area
Next Week the kitchen cabinets should arrive so our mission this next week is to get the kitchen sanded, and painted so we can install the cabinets as soon as they arrive.  Once they are installed we need to order the granite and get it installed! (ahhh we can't wait for an fully operable kitchen!)